A 24/40 MW campus is built from standardized IT containers, cooling modules, and power modules arranged in a repeatable block layout.
The 24 MW rating refers to the IT compute capacity, while the 40 MW figure represents the total integrated system capacity including cooling and power.
This modular approach enables predictable capacity expansion, simplifies operations, and reduces lead time to 3 months, with site deployment and go-live generally completed within six months.