24MW Modular Containerized Data Center Cluster

24MW Modular Containerized Data Center Cluster
Campus Overview

Campus Overview

A 24/40 MW campus is built from standardized IT containers, cooling modules, and power modules arranged in a repeatable block layout.

The 24 MW rating refers to the IT compute capacity, while the 40 MW figure represents the total integrated system capacity including cooling and power.

This modular approach enables predictable capacity expansion, simplifies operations, and reduces lead time to 3 months, with site deployment and go-live generally completed within six months.

Consult
40MW

total capacity

400-1200KW

IT load per container

75%+ deployment time reduction

0 municipal water use

Up to 560 racks (40 kW each) or 200 racks (120 kw each)

Solution Features

Water-Free Cooling

Optional water-free dry cooler reduces water resource consumption to nearly zero.

High-Temperature Operation

Operates reliably in environments up to 55 °C, withstanding peak temperatures of 65 °C.

Modularized Delivery

Modular deployment shortens project timelines by more than 75%.

Fourier Powers the Future
of Al & HPC

Our global team is happy to assist with your modular data center project needs.
First Name*
Last Name*
Email*
Phone Number
Company*
Message*

Your information is safe with us. We do not share your data with third parties.

x
Our use of cookies
We would like to use necessary cookies to improve your browsing experience and the quality of our website. We would also like to set analytics cookies and advertisement cookies that help us make improvements by measuring how you use our website. Detailed information about the use of cookies on this website and how you can control your consent can be found in our Cookie Policy and Privacy Policy.
Accept only strictly necessary cookies Accept all cookies